CETCO Energy Services

LOCATION:
New Iberia, LA

ARCHITECT:
Mourain Design-Build Project

For this specialized project for CETCO, Mourain Construction designed and constructed a 30’ x 30’ x 10’ relocatable, modular steel pressure testing booth. The project scope included 14,500 SF of heavy duty concrete paving to accommodate access for large fork-lift traffic. Design and construction of a 40’ x 70’ x 51’ independent crane-way with adjacent control room building. The project also required installation of a 30 ton bridge crane.